FarmGPU's data center infrastructure is primarily hosted at a tier 3 datacenter in Rancho Cordova, CA called Conscious Capital Data Center. We meet our most stringent partner requirements for 99.99% availability, ensuring enterprise-grade reliability, security, and performance for AI workloads.

## Power Infrastructure

* Dual independent utility feeds from separate substations, each capable of supporting 100% of data center load
* N+1 redundant UPS systems with minimum 15-minute runtime at full load
* N+1 redundant generator systems with 48-hour on-site fuel storage
* 2N redundant power distribution paths from utility to rack level
* Remote power monitoring and management at rack level
* Monthly generator load testing and quarterly full-load system tests
* 24/7 on-site facilities team for immediate response

## Network Architecture

* Minimum 100 Gbps total bandwidth capacity
* Dual diverse internet circuits from separate providers with BGP routing
* Redundant core switches in high-availability configuration
* DDoS protection solutions
* Performance guarantees:
  * Sub-80% network utilization during peak hours
  * Less than 0.1% packet loss
  * P95 round-trip time under 4ms within data center
  * P95 jitter under 3ms within data center

## Security and Compliance

* ISO 27001 certified data center
* 24/7 on-site security personnel
* Isolated secure racks with restricted access
* Comprehensive access logging and monitoring
* Regular security audits and compliance reviews
* Tier III+ data center standards compliance

## Environmental Controls

* Advanced liquid cooling systems for optimal GPU performance
* N+1 redundancy for cooling infrastructure
* Real-time environmental monitoring and alerts
* Regular thermal imaging and preventive maintenance

FarmGPU is compliant with the RunPod secure cloud data center and network specifications below

[https://docs.runpod.io/hosting/partner-requirements#3-data-center-power-requirements](https://docs.runpod.io/hosting/partner-requirements#3-data-center-power-requirements)

## **3. Data Center Power Requirements**

| **Requirement**         | **Specification**                                                                                                                                                                                                                                                                                                                                                                                         |
| ----------------------- | --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| Utility Feeds           | Minimum of two independent utility feeds from separate substations. Each feed capable of supporting 100% of the data center's power load. Automatic transfer switches (ATS) for seamless switchover between feeds with UL 1008 certification (or regional equivalent)                                                                                                                                     |
| UPS                     | - N+1 redundancy for UPS systems- Minimum of 15 minutes runtime at full load                                                                                                                                                                                                                                                                                                                              |
| Generators              | N+1 redundancy for generator systems. Generators must be able to support 100% of the data center's power load. Minimum of 48 hours of on-site fuel storage at full load. Automatic transfer to generator power within 10 seconds of utility failure                                                                                                                                                       |
| Power Distribution      | Redundant power distribution paths (2N) from utility to rack level. Redundant Power Distribution Units (PDUs) in each rack. Remote power monitoring and management capabilities at rack level                                                                                                                                                                                                             |
| Testing and Maintenance | Monthly generator tests under load for a minimum of 30 minutes. Quarterly full-load tests of the entire backup power system, including UPS and generators. Annual full-facility power outage test (coordinated with Runpod). Regular thermographic scanning of electrical systems. Detailed maintenance logs for all power equipment. 24/7 on-site facilities team for immediate response to power issues |
| Monitoring and Alerting | Real-time monitoring of all power systems. Automated alerting for any power anomalies or threshold breaches                                                                                                                                                                                                                                                                                               |
| Capacity Planning       | Maintain a minimum of 20% spare power capacity for future growth. Annual power capacity audits and forecasting                                                                                                                                                                                                                                                                                            |
| Fire Suppression        | Maintain datacenter fire suppression systems in compliance with NFPA 75 and 76 (or regional equivalent)                                                                                                                                                                                                                                                                                                   |

## **4. Network Requirements**

| **Requirement**         | **Specification**                                                                                                                                                                                                                                                                                                                                 |
| ----------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| Internet Connectivity   | Minimum of two diverse and redundant internet circuits from separate providers. Each connection should be capable of supporting 100% of the data center's bandwidth requirements. BGP routing implemented for automatic failover between circuit providers. 100 Gbps minimum total bandwidth capacity                                             |
| Speed Requirements      | Preferred: >= 10 Gbps sustained upload/download speed per server. Minimum: >= 5 Gbps sustained upload/download speed per server. Speed measurements should be based on sustained throughput over a 60 second interval during a typical workload                                                                                                   |
| Core Infrastructure     | Redundant core switches in a high-availability configuration (e.g., stacking, VSS, or equivalent)                                                                                                                                                                                                                                                 |
| Distribution Layer      | Redundant distribution switches with multi-chassis link aggregation (MLAG) or equivalent technology. Minimum 100 Gbps uplinks to core switches                                                                                                                                                                                                    |
| Access Layer            | Redundant top-of-rack switches in each cabinet. Minimum 100 Gbps server connections for high-performance compute nodes                                                                                                                                                                                                                            |
| DDoS Protection         | Must have a DDoS mitigation solution, either on-premises or on-demand cloud-based                                                                                                                                                                                                                                                                 |
| Quality of service      | Maintain network performance within the following parameters: Network utilization levels must remain below 80% on any link during peak hours. Packet loss must not exceed 0.1% (1 in 1000) on any network segment. P95 round-trip time (RTT) within the data center should not exceed 4ms. P95 jitter within the datacenter should not exceed 3ms |
| Testing and Maintenance | Regular failover testing of all redundant components (minimum semi-annually). Annual full-scale disaster recovery test. Maintenance windows for network updates and patches, with minimal service disruption scheduled at least 1 week in advance                                                                                                 |
| Capacity Planning       | Maintain a minimum of 40% spare network capacity for future growth. Regular network performance audits and capacity forecasting                                                                                                                                                                                                                   |